分類 種類
香港地鐵 (新支綫及工程項目)

西港島綫- 705 堅尼地城站建造工程及越位隧道工程

MTR West Island Line- 705 Kennedy Town Station & Overrun Tunnel Construstion

 

Main Contractor:

Gammon Construction Limited

 

Products:

JAM Grade 8.8 M24 x 400mm Threaded Rod (Hot Dip Galvanized) c/w
Class 10 Nut & Washer

 

JAM Stainless Steel 316 (A4-80) Fully Threaded Rod M12 x 250mm Threaded Rod c/w
S.S. A4-80 Hex. Nut & Washer

JAM Grade 8.8 Hex. Bolts (Hot Dip Galvanized) :
c/w class 8 Nut, Flat Washer & Spring Washer
M30 x 90mm, M30 x 80mm, M24 x 100mm, M24 x 90mm

 

 

JAM Stainless Steel 316 (A4-70) Bi- Metal #3 Hex. Washer Head Self-Drilling Screw M5.5 x 25mm

JAM Stainless Steel 316 (A4) Bi- Metal #5 Hex. Washer Head Self-Drilling Screw M5.5 x 50mm

 

Date: May 2012