分類 種類
高鐵- 廣深港高速鐵路香港段

XRL 811B- 西九龍總站連接隧道(南)

XRL 811B – West Kowloon Terminus Approach Tunnel (South)
The major elements of works under Contract 811B comprise the following:
i) Construction of approximately 430 m long cut and
cover reinforced concrete piled tunnel.

ii) Construction of 1.5 m thick x approximately 710 m long diaphragm walls
with founding level at approximately -25 mPD to -46 mPD.

iii) Construction of a reinforced concrete tunnel ventilation building and associated ABWF and building services.

iv) Construction of a Public Transport Interchange (footprint area approximately 19,100 m²) with landscape deck (footprint area approximately 12,800 m²), and the associated E&M, ABWF and landscaping works.

v) Temporary and permanent traffic diversions, including construction of a temporary footbridge, demolition and re-provisioning of permanent footbridge.

vi) Construction of a public toilet.

vii) Temporary diversion of four major underground drainage box culverts.

viii) Associated utilities, drainage and roadworks.
Main Contractor:
Gammon- Leighton JV
Products:
JAM Grade 8.8 Hot Dip Galvanized Threaded Rod (Holding down bolt) with Nuts and Washers
M30 x 1000mm
M24 x 1000mm, M24 x 750mm
JAM Grade 8.8 Hot Dip Galvanized Hex Bolt with Nuts and Washers
M33 x 160mm, M33 x 130mm, M30 x 120mm, M30 x 75mm,
M27 x 140mm, M27 x 120mm, M27 x 90mm, M16 x 80mm,
M16 x 60mm, M16 x 45mm
JAM Grade 8.8 Zinc Plated Steel Hex Bolt with Nuts and Washers
M16 x 60mm
Date: 2012 01-2012 06
JAM Grade 8.8 Zinc Plated Threaded Rod (Holding down bolt) with Nuts and Washers
M12 x 3000mm
Date: 2011 08 - 2012 08